Demarcation Study of r. Acheloos, HP Avlaki, Greece
Demarcation Study of r. Acheloos, HP Avlaki, Greece
SITE
r. Acheloos, ~17,5 Km along the river bed, from 200 m upstream of the reservoir’s tail in maximum operating level (+382,00) up to 200 m downstream of the HP site
PROJECT OWNER
TERNA ENERGY
DESIGN BY
SOFIOS S.A.
YEAR
03/2021
DESCRIPTION
Avlaki HP of total power of 83,60 MW, is under design and to be constructed on r. Acheloos in western Greece.
It will be consisted of a concrete dam and the power station building plant will be constructed at the dam’s foot.
The total volume of the reservoir at maximum operating level will be 350 x 106 m3.
The reservoir will flood almost 17 Km of the river bed.
According to the Greek legislation a demarcation study needs to be done for the project to be environmentally approved