Ladonas river, Prefecture of Arkadia, Greece
PPC RENEWABLES S.A. – TERNA ENERGY S.A.
SOFIOS S.A.
Water intake from low head river closure by radial gates.
Diverted flows to the power plant are driven through a hydraulic tunnel of L =~3 Km and then released again to the watercourse.