06/2010 – Preliminary Study for energy production license
06/2010 – Geological Report
02/2021 – Grant for energy production
DESCRIPTION
Update of the design based on the Production License (Electricity and Storage) with a pumped storage hydroelectric project, with a production capacity for :
Vrochonera Ι: 401 MW and an installed pumping capacity of 372 MW
Vrochonera ΙΙ: 231,5 MW and an installed pumping capacity of 217,8 MW