In 02/2015 a flood event has caused damages along the existing pipeline of SHP Thermorema and rehabilitation projects were required. In 12/2015 the required Application Study was completed with proposals for restorations of the damages and works for flood protections.
In 09/2017 Application Study was completed with proposals to improve the existing operation of SHP with addition of a radial gate.
TECHNICAL CHARACTERISTICS
Water intake Tirolean type on existing grade control structure (L~38 m, H = 3-4 m)
GRP pipe L~6 Km, DN900 mm and DN800 mm in sections
Power Station ~370 m2, with four (4) Pelton units with P = 4 x 850 = 3.400 KW