Evinos river, Prefecture of Aitoloakarnania, Greece
TERNA ENERGY S.A.
SOFIOS S.A.
11/2021
SHP Makrino with nominal flow Q = 32,50 m3/s, H = 36,50 m and installed power capacity ~8,6 MWe is going to be constructed on r. Evinos.
According to the Greek legislation a demarcation study needs to be done for the project to be environmentally approved.
For detailed Technical Characteristics, click here.