SHP at the valve chamber downstream of the diversion-bottom outlet tunnel of the under construction dam of Agioneri, using the ecological small flows.
Engineering Report Existing works:
Earthfill dam (Under Construction)
H = 48 m
Reservoir capacity 13.700.000 m3
Spillway Q = 1.523 m3/s (flip bucket)
Existing diversion tunnel horse shoe section: D = 5 m, L = 222,50 m